Lake Hawea 3 Point Mooring
Lake Hawea Data Buoy installation for Otago University.
Deployment of three suction anchors in 350 metres of water to support a monitoring buoy.
This was a very tricky installation as we were unable to use one of our larger vessels and lowering three half tonne suction anchors down 375 metres is quite a challenge. The installation work required a very good weather window as we were using a 4.1 naiad towing a 5-metre barge with a moon pool to lower the suction anchors through.
All went very well and our clients were very pleased.