Harrison Cove, Milford Sound
The third SALM system installed using a SALM base as the anchoring point.
A very challenging project to complete. The installation site at 70m water depth, meant construction of the base had to be completed offsite in much shallower water. The base then had to be manoeuvred carefully to the installation site before being anchored into place.
